052
Trolley for the Ealing room roof in place. 12 OCT 2001
053
Close up showing how the grooved wheels fit the track. 12
OCT 2001
054
Ealing room Trolley in place and ground cleared for the patio.
12 OCT 2001
055
Bruce Grim, Andy Bogdan, Siegfried Jachmann Patrick Wiggins and
Ron Ford lift a portion of the Big Scope room's roof trolley into place.
McNeil image 13 OCT 2001
056
Bruce Grim, Andy Bogdan, Siegfried Jachmann and Ron Ford lift the
north most part of the Big Scope room roof trolley into place. 13
OCT 2001
057
Siegfried Jachmann, Andy Bogdan, Ron Ford and Bruce Grim use tape
measures to ensure the Big Scope room's roof trolley is square before welding.
13 OCT 2001
058
Siegfried Jachmann uses a grinder to prepare for welding (and to
attempt to set his shirt on fire). 13 OCT 2001
059
Bruce Grim welds the Big Scope room roof trolley. 13 OCT
2001 Ron Ford image
060
Bruce Grim makes sure that Patrick Wiggins and Siegfried Jachmann
get the Big Scope room's trolley winch I-beam placed properly. 13
OCT 2001
061
Two of the Big Scope room's roof trolley wheels in place.
13 OCT 2001 Ron Ford image
062
Both roof trolleys ready for roofing. 13 OCT 2001 Ron
Ford image
063
The Big Scope room's trolley winch I-beam and support frame.
When completed the winch will be used for lifting, moving and positioning
heavy objects in the Big Scope room. A similar, but smaller, apparatus
will be used in the Ealing room. 14 OCT 2001
064
Bruce Grim paints the Ealing room roof trolley. 22 OCT 2001
Ron Ford image
065
Patrick Wiggins paints one of the Ealing room roof rails.
22 OCT 2001 Ron Ford image
066
Bruce Grim and Patrick Wiggins finish applying the 2nd of three
coats of paint to the roof support structure. 26 OCT 2001
067
First roof truss up on the Ealing Room. 03 NOV 2001
Ron Ford image
068
All of the trusses up on the Ealing Room. 03 NOV 2001
Ron Ford image
069
Roger Butz and Bruce Grim lower the first Big Scope Room truss
into position. 03 NOV 2001 Ron Ford image
070
John Moreton checks to see that all of the SPOC 2 roof trusses
are properly placed. 03 NOV 2001 Ron Ford image
071
Roof work from on high. Kathleen McCarthy (now Warner) shot the image as Ken
Warner flew the plane. 03 NOV 2001 072
Ken Harris and Roger Butz fit the first piece of roofing for the
Big Scope Room into place. 05 NOV 2001
073
Roger Butz trims the edge of the Big Scope Room roof. 05
NOV 2001
074
Andy Bogdan and Ron Ford determine how many SLAS members it takes
to change a saw blade. 05 NOV 2001
075
Roger Butz, Patrick Wiggins, Ken Harris and Siegfried Jachmann
nail down sections of the Big Scope Room roof. 05 NOV 2001
Ron Ford image
076
Ken Harris tries not to remove his foot. 05 NOV 2001
Ron Ford image
077
All SPOC 2 upper roof sections in place. 05 NOV 2001
Ron Ford image
078
Roger Butz and Bruce Grim witness "1st Slide" of the Ealing Room
roof. 05 NOV 2001 Ron Ford image
079
SLAS member and Deseret News reporter Joe Bauman interviews Roger
Butz about SPOC 2. 08 NOV 2001
080
Ron Ford is interviewed by SLAS member and Deseret News reporter
Joe Bauman about SPOC 2. 08 NOV 2001
081
Patrick Wiggins and Bruce Grim are interviewed by SLAS member and
Deseret News reporter Joe Bauman about SPOC 2. 08 NOV 2001
Ron Ford image
082
Ron Ford looks on as Roger Butz and Andy Bogdan measure the south
end of the Ealing Room roof for sheeting. 08 NOV 2001
083
Roger Butz, Ron Ford and Patrick Wiggins apply sheeting to the
Ealing Room roof. 08 NOV 2001 McNeil image
084
Andy Bogdan and Patrick Wiggins finish applying sheeting to the
south end of the Ealing Room roof. 08 NOV 2001
085
Patrick Wiggins, Roger Butz and Andy Bogdan finish applying sheeting
to the south end of the Big Scope Room roof. 08 NOV 2001 Ron
Ford image
086
Boyd McNeil and Ron Ford add sheeting to the Big Scope Room roof.
08 NOV 2001
087
South ends of scope room roofs with all sheeting in place.
08 NOV 2001
088
Roger Butz, Patrick Wiggins and Andy Bogdan position the final
piece of roof sheeting. 08 NOV 2001 McNeil image
089
Bruce Grim makes final adjustments to the Big Scope Room roof.
08 NOV 2001
090
First time both roofs are off at the same time. 08 NOV 2001
091
Patrick Wiggins tries closing the Big Scope Room roof the hard
way as Boyd McNeil catches his antics on film. 08 NOV 2001
Ron Ford image
092
Bruce Grim, Andy Bogdan and Roger Butz have better luck at closing
the Big Scope Room roof. Both roofs will eventually be motorized.
08 NOV 2001
093
Both roofs safely closed. 08 NOV 2001 094
This is why SPOC 1 has been closed. But it might make a good
storage room for the restaurant. 08 NOV 2001
095
On 20 NOV 2001 Bruce Grim and Roger Butz installed tar paper on
the roofs, here seen from the southeast on 22 NOV 2001.
096
And here as seen from the northwest. 22 NOV 2001
|