050
Roger Butz digging the north
drainage trench. 26 FEB 2002
Ron Ford image
051
The west drainage
trench. 28 FEB 2002
052
The north drainage
trench. 28 FEB 2002
053
The east drainage
trench. 28 FEB 2002
054
Sump at the south end of the
east drainage trench. 28 FEB
2002
055
Ron Ford adds gravel to the
east drainage trench. 01 MAR
2002
056
Bruce Grim struggles with a
section of perforated drain pipe.
01 MAR 2002
057
Bruce Grim and Ron Ford pull
filter cloth over a section of perforated
drain pipe. The cloth allows water to pass into the pipe but
keeps
mud & rocks from plugging the pipe's perforations. 01 MAR
2002
058
Patrick Wiggins levels the
gravel in the bottom of the west drainage
trench. 01 MAR 2002 Ron Ford image
059
Drain pipe in the west
drainage trench and ready to be covered.
01 MAR 2002
060
Drain pipe and a top layer
of gravel has been installed in the
north drainage trench. 01 MAR 2002 Ron Ford image
061
Drain pipe and a top layer
of gravel has been installed in the
east drainage trench. 01 MAR 2002 Ron Ford image
062
Stansbury Park Service
Agency's Colton Park uses the back hoe to
fill in the drainage trenches. 06 MAR 2002
063
Trenches filled and area
ready for landscaping. 06 MAR 2002
064
Forms for the new "SPOC
walk" installed and awaiting the concrete.
13 APR 2002
065
066
***
The new SPOC walk being
poured. 23 APR 2002
067
The part of the patio that
had suffered from frost heave has been
repoured. 23 APR 2002
068
View of the newly finished
SPOC walk. Dark section in the
foreground is a part of the patio that the cement truck rolled on and
cracked.
The cement company replaced that section at no charge to SLAS. 23
APR 2002
069
Close up of the new SPOC
walk showing the inlaid pattern that not
only looks nice but may also slow down the skate boarders. 23 APR
2002
070
The doors have been painted
with red primer paint prior to application
of the white top coat. 23 APR 2002
071
072
***
Roger Butz and Ron Ford take
their turns on the Bobcat. 07
MAY 2002 Ron Ford images
073
Bruce Grim and Ron Ford
plant the first plant of the day.
88 followed. 07 MAY 2002
074
Patrick Wiggins and Bruce
Grim planting lilac bushes on the south
perimeter. 07 MAY 2002 Ron Ford image
075
Some of the locals look
on. 07 MAY 2002 Ron Ford image
076
Bruce Grim, Boyd McNeil and
Ken Harris look on as one of the 29
holes for the hedge is excavated. 07 MAY 2002 Ron Ford
image
077
The hedge is planted.
Now let's hope it grows. 07 MAY
2002 Ron Ford image
078
Stakes mark the locations of
the lilac bushes planted on the west
perimeter. 07 MAY 2002
079
Stakes mark the locations of
the lilac bushes planted on the south
perimeter. 07 MAY 2002
080
Stakes mark the locations of
the lilac bushes planted on the east
perimeter. 07 MAY 2002
081
Ron Ford points out the
"front porch light" and the address numbers
that were required before a final approval by the building inspector
could
be issued. 07 MAY 2002
082
A smiling Bruce Grim shows
the building inspector's final approval.
07 MAY 2002
083
One of two lights on the
nearby restaurant now properly shielded
thanks to the labors of Roger Butz. 07 MAY 2002
084
Landscaping of the
surrounding grounds has begun. 10 MAY
2002
085
Just after Roger Butz and
Bruce Grim installed the rain gutter.
14 NOV 2002
086
SLAS members had
help with digging in the SPOC grounds. 03 JUL 2003 Ron Ford
image
087
Ken Harris, Bruce
Grim and Patrick Wiggins weed and edge around the hedge. Ron Ford
and Patricia McWhorter, not shown, also helped. 03 JUL 2003
Ron Ford image
088
Bruce Grim and
Chris Clark spread bark on the freshly weeded ground. 08 JUL 2003
089
Weeding done and
looking good. 11 JUL 2003
090 091
+++
New trees donated by the Stansbury Park Service
Agency and planted on 05 AUG 2006 by the Boy Scouts. 06 AUG 2006
092 | 093 | |
092 | 093 |
094 |
095 |
096 |
097 |