001
Before the slab sections could be cut Bruce Grim, Roger Butz, Andy
Bogdan and Patrick Wiggins remove the snow and ice. 22 FEB
2002
Ron Ford image
******
Ron Ford, Andy Bogdan, Bruce Grim, Patrick Wiggins Boyd McNeil
and Roger Butz take their turns running the concrete cutting saw. 22
FEB
2002
008
Roger Butz and Ron Ford try a bit of "curling on concrete".
22 FEB 2002
009
Roger Butz takes advantage of Patrick Wiggins being a vegetarian.
22 FEB 2002 Ron Ford image
010
With the cuts finished Andy Bogdan and Roger Butz use pry bars
to lift a section of concrete. 22 FEB 2002
011
Stansbury Park Service Agency's Colton Park uses the back hoe to
remove the buckled pieces of concrete. 25 FEB 2002 Ron Ford
image
012
After the concrete was removed. 26 FEB 2002
013
Roger Butz digging the north drainage trench. 26 FEB 2002
Ron Ford image
014
The west drainage trench. 28 FEB 2002
015
The north drainage trench. 28 FEB 2002
016
The east drainage trench. 28 FEB 2002
017
Sump at the south end of the east drainage trench. 28 FEB
2002
018
Ron Ford adds gravel to the east drainage trench. 01 MAR
2002
019
Bruce Grim struggles with a section of perforated drain pipe.
01 MAR 2002
020
Bruce Grim and Ron Ford pull filter cloth over a section of perforated
drain pipe. The cloth allows water to pass into the pipe but
keeps
mud & rocks from plugging the pipe's perforations. 01 MAR
2002
021
Patrick Wiggins levels the gravel in the bottom of the west drainage
trench. 01 MAR 2002
022
Drain pipe in the west drainage trench and ready to be covered.
01 MAR 2002
023
Drain pipe and a top layer of gravel has been installed in the
north drainage trench. 01 MAR 2002 Ron Ford image
024
Drain pipe and a top layer of gravel has been installed in the
east drainage trench. 01 MAR 2002 Ron Ford image
025
Stansbury Park Service Agency's Colton Park uses the back hoe to
fill in the drainage trenches. 06 MAR 2002
026
Trenches filled and area ready for landscaping. 06 MAR 2002