007
Ken Harris cutting stakes for forms, 24 MAR 2001. McNeil
photo
008
Ken Harris surveying for final grade, 24 MAR 2001. McNeil
photo
009
Bruce Grim & Siegfried Jachmann "head to head" in the footing
trench. Andy Bogdan and Wayne Clarke look on, 24 MAR 2001.
McNeil photo
010
Workers look for the first concrete truck to arrive, 24 MAR 2001.
McNeil photo
011
Much anticipated concrete truck #1 arrives, 24 MAR 2001.
012
"1st mud" for the SPOC 2 footings & floor coming down the chute,
24 MAR 2001.
013
First pour for the SPOC 2 footings & floor, 24 MAR 2001.
McNeil photo
014
President Jachmann supervises the pour, 24 MAR 2001
015
Ken Harris and Mike Wilson prepare for a pour, 24 MAR 2001.
McNeil photo
016
Truck #2 begins to pour, 24 MAR 2001
017
Truck #2 is joined by truck #3, 24 MAR 2001
018
Yet another pour, 24 MAR 2001. McNeil photo
019
And another, 24 MAR 2001. McNeil photo
020
Patrick Wiggins, Roger Butz, Siegfried Jachmann and Wayne Clarke
move the mud, 24 MAR 2001. McNeil photo
021
Group portrait: Trucks #1, #2 & #3 at the site, 24 MAR 2001
022
Preparing to scree the floor with the long 2 x 4, 24 MAR 2001
023
Mike Wilson, John Moreton and Ken Harris work the concrete, 24
MAR 2001. McNeil photo
024
Crew keeps an eye on Patrick Wiggins (they can't believe he's actually
working!), 24 MAR 2001. McNeil photo
025
Screeing of the Ealing room floor nearly done, 24 MAR 2001
026
Andy Bogdan uses a float on the Ealing Room floor while Bruce Grim
finishes screeing the control room floor, 24 MAR 2001
027
Screeing the "Grim Scope" bay floor. Large black & small
white pipes seen sticking up from the floor will carry computer, video
& control cables between the telescopes and the control room, 24
MAR
2001
028
Andy Bogdan does some touch up work on the control room floor,
24 MAR 2001
029
Screeing a corner of the Grim Scope bay room floor, 24 MAR 2001
030
Truck #4 makes its contribution, 24 MAR 2001
031
No man is an island but John Moreton seems to have marooned himself
on a dry patch in the middle of the Grim Scope bay floor, 24 MAR 2001
032
Ken Harris giving the floor some finishing touches of his own,
24 MAR 2001
033
Siegfried Jachmann shows how it's done, 24 MAR 2001
034
Entire floor ready for brushing as storm clouds gather, 24 MAR
2001
035
Most of the day's crew pose with their work before going to "Advanced
Training", 24 MAR 2001
036
Workers pose with the newly finished floor, 24 MAR 2001.
McNeil photo
037
One good looking floor, 24 MAR 2001
038
Andy Bogdan brushes the floor, 24 MAR 2001
039
Patrick Wiggins & Scott Crosby leave the newly finished floor,
24 MAR 2001. McNeil photo
040
Patrick Wiggins keeps with tradition and inscribes the club's initials
and the year, 24 MAR 2001
041
Patrick Wiggins inscribes "SLAS 2001" in the fresh concrete, 24
MAR 2001. McNeil photo
042
SLAS's traditional inscription, 24 MAR 2001
043
Happy campers Bruce Grim and Andy Bogdan pose in front of the results
of their labors, 24 MAR 2001. McNeil photo
044
Cleaning up the site, 26 MAR 2001
045
Cleaning up the site, 26 MAR 2001
046
Patrick Wiggins, Andy Bogdan, Roger Butz, Boyd McNeil and Bruce
Grim agree that no SLAS function is complete without an "Advanced
Training
Session", 26 MAR 2001
047
Wide angle view of the site, 26 MAR 2001
048
Close up showing the newly installed safety tape and rebar caps,
26 MAR 2001