Stansbury Park Observatory Complex (SPOC)
Donna Pease Wiggins Refractor House


Putting Up the Roof & Dome
17 SEP 2005 to 07 OCT 2005
(click on images for enlarged view)


101

Bruce Grim makes sure the east wheels are over the track.  17 SEP 2005

102

Contact!  17 SEP 2005

103

Patrick Wiggins gets a ride up for an aerial view.  17 SEP 2005  Boyd McNeil image.

104

Who's that watching from below?  17 SEP 2005

105

It's Bruce Grim, Siegfried Jachmann, Ken Harris and Boyd McNeil.  17 SEP 2005

106

The Refractor House from 25 meters altitude.  17 SEP 2005

107

The Harmons observatory and Quintin Foster from above.  17 SEP 2005

108

SPOC from the east.  17 SEP 2005

109

SPOC from the north.  17 SEP 2005

110

Patrick Wiggins cuts away one of 4 steel plates that kept the dome from sliding.  17 SEP 2005

111                 112
+++
Closed and open.  17 SEP 2005

113

Roger Butz, Quintin Foster, Bruce Grim, Siegfried Jachmann, Patrick Wiggins, Ken Harris, Chris Hatch, Tom Poyner and Boyd McNeil.  17 SEP 2005  Boyd McNeil image.

114

Crane operators Tom Poyner and Chris Hatch.  17 SEP 2005  Boyd McNeil image.

115

The new observatory's first sunset.  17 SEP 2005

116

The new observatory's first sunset.  17 SEP 2005

117                  118
+++
Bruce Grim and Patrick Wiggins install the dome trolley roof corner sections.  18 SEP 2005

119

Bruce Grim attaches devices to hold the dome trolley down in very high winds.  19 SEP 2005

120

Ken Harris assembles the dome trolley's new south skirt.  20 SEP 2005

121

Bruce Grim, Ken Harris and Patrick Wiggins position the east half of the dome trolley's new south skirt.  20 SEP 2005  Boyd McNeil image.

122

Ken Harris nails the two halves of the dome trolley's new south skirt together.  20 SEP 2005  Boyd McNeil image.

123

Patrick Wiggins installs the northwest bird blocker.  20 SEP 2005

124                  125
+++
Dome partially open and closed showing the position of the dome trolley's new south skirt.  20 SEP 2005

126

Northeast and northwest bird blockers in place.  20 SEP 2005

127

Patrick Wiggins installs the dome trolley roof's rubber membrane.  30 SEP 2005

<>128

Bruce Grim mounted the dome motor and gear train today.  02 OCT 2005

129

Bruce Grim prepares to connect one end of the cable that will slide the dome off.  04 OCT 2005

130

Bruce Grim demonstrates that the dome slide mechanism works.  05 OCT 2005

131

The dome movement gears, pulley and cable.  05 OCT 2005

132

Patrick Wiggins applies a layer of Top Coat to the dome trolley roof.  07 OCT 2005

133

Patrick Wiggins applies a 3rd coat of paint to the Refractor Bay ceiling.  07 OCT 2005