051
The crane has arrived. 03 SEP 2005 Boyd McNeil image.
052
Siegfried Jachmann, Bruce Grim and Patrick Wiggins observe as Roger
Butz attaches a lifting cable. 03 SEP 2005 Boyd McNeil
image.
053
One of the crane operators, Siegfried Jachmann and Roger Butz guide
the dome to its maintenance position. 03 SEP 2005 Boyd
McNeil
image.
054
Clearing the back of the truck. 03 SEP 2005 Boyd McNeil
image.
055
Bruce Grim and Siegfried Jachmann squeeze the dome between the
old and new observatories. 03 SEP 2005
056
Patrick Wiggins and Siegfried Jachmann guide the dome down onto
the trolley. 03 SEP 2005 Boyd McNeil image.
057
The dome in its maintenance position on the trolley. 03 SEP
2005
057
Patrick Wiggins scrapes away decades old, congealed grease from
the dome's base ring. 06 SEP 2005
057
Bruce Grim uses a winch to pull the dome into round. 06 SEP
2005
056
Bruce Grim tack welds the dome to the trolley. 06 SEP
2005
Boyd McNeil image.
057
Patrick Wiggins removes loose interior paint. 06 SEP 2005
058
Bruce Grim and Ken Harris prepare the dome trolley for installation
of the skirt. 07 SEP 2005
059
Patrick Wiggins removes deteriorated caulk while Bruce Grim works
on the trolley. 07 SEP 2005
060
061
+++
Patrick Wiggins scrubs the dome, outside and in. 08 SEP 2005
062
+++
Ken Harris and Bruce Grim assemble the east dome trolley skirt
frame. 08 SEP 2005
063
+++
Bruce Grim and Ken harris lift the east skirt frame. 08 SEP
2005
064
+++
Patrick Wiggins recaulks the dome. Note east skirt frame
below. 08 SEP 2005
065
066
+++
Roger Butz and Patrick Wiggins get started on painting the dome's
interior. 08 SEP 2005
067
Bruce Grim paints the dome trolley. 11 SEP 2005
068
Patrick Wiggins gets started on the second (and hopefully final)
interior coat. 11 SEP 2005
069
Patrick Wiggins racing fading daylight to install the shutter's
south side sections. 12 SEP 2005
070
Bruce Grim works from the inside to fasten the shutter's lower
south side sections in place. 12 SEP 2005
071
Dale Wilson works from the inside to fasten the shutter's upper
south side sections in place. 12 SEP 2005
072
Patrick Wiggins losing the race against fading daylight, about
to install the shutter's final south side section. 12 SEP 2005
073
All of the shutter's south side sections are glued and bolted in
place. 12 SEP 2005
074
All of the shutter's north side sections are glued and bolted in
place. 13 SEP 2005
075
Bruce Grim applies another coat of exterior paint. 13 SEP
2005
076
Dale Wilson changes the shutter from red to white. 13 SEP
2005
077
Bruce Grim and Ken Harris prepare to install the east skirt
frame.
14 SEP 2005
078
Ken Harris and Bruce Grim install the east skirt cover. 14
SEP 2005
079
Bruce Grim and Ken Harris install the north skirt frame.
14 SEP 2005
080
SLAS photographer Boyd McNeil records Ken Harris and Bruce Grim
building the south skirt frame. 14 SEP 2005
081
South skirt frame installed. Note wheels have also been
installed.
14 SEP 2005
082
One of the dome wheels. 14 SEP 2005
083
Patrick Wiggins paints the dome tracks. 14 SEP 2005
084
West skirt frame installed. Lookin' good after another long
day's labor. 14 SEP 2005
085
Ken Harris and Bruce Grim enclose the south skirt frame.
15 SEP 2005
086
Ken Harris and Bruce Grim start work on the northeast trolley roof
cover. 15 SEP 2005
087
Bruce Grim applies the final exterior coat from below. 15
SEP 2005
088
Patrick Wiggins says "Don't try this at home!" 15 SEP 2005
089
090
+++
Dome from the southeast and northwest at day's end. 15 SEP
2005
091
Bruce Grim and Ken Harris assemble the dome trolley roof.
16 SEP 2005 Boyd McNeil image.
092
093
+++
Dome from the northeast and northwest at day's end. 15 SEP
2005
094
The crane arrives. 17 SEP 2005
095
Patrick Wiggins rushes to add one last piece to the shutter.
17 SEP 2005 Boyd McNeil image.
096
Ken Harris holds one of the guide lines as the dome is about to
be lifted. 17 SEP 2005
097
Lift off! Siegfried Jachmann and Ken Harris hold guides lines
as Quintin Foster and Roger Butz await the dome on the roof . 17
SEP 2005
098
View of the interior from down under. 17 SEP 2005
099
Dome nearly in position. 17 SEP 2005
100
Dome about to touch down as seen through the storage room
wall.
17 SEP 2005