Stansbury Park Observatory Complex (SPOC)
Kolob Building

Pouring the Floor, Telescope Pad and Sidewalk
30 APR 2017 to 06 MAY 2017
(click on images for enlarged view)
(Photos by Patrick Wiggins unless otherwise noted)


001

Preparing the floor. 30 APR 2017

002

Preparing the floor. 30 APR 2017

003

Preparing the telescope pad. 01 MAY 2017

004

Preparing the floor. 01 MAY 2017

005

Red light is a laser leveling device. 01 MAY 2017

006

Gravel sub-base being laid.  02 MAY 2017

007

02 MAY 2017

008

02 MAY 2017

009

02 MAY 2017

010

Using a device to make sure the pad will be level.  02 MAY 2017

011

Using a device to make sure the pad will be level.  02 MAY 2017

012

Device used to tamp down and level the gravel.  Sign on the wall in the back was used to indicated where an anchor bolt was to be located in the floor below.  02 MAY 2017

013

The construction crew often worked late into the night.  02 MAY 2017

014

Telescope pad forms up.  Spreading and leveling the gravel.  Slab rebar installed on building floor.  03 MAY 2017

015

Rebar for the floor.  03 MAY 2017

016

Rebar for the floor.  03 MAY 2017

017

Opening in the east wall for the pedestrian door.  03 MAY 2017

018

Preparing the connection sidewalk.  04 MAY 2017

019

"First Pour" of the floor.  05 MAY 2017

020

First pour of floor and slab concrete.  05 MAY 2017

021

05 MAY 2017

022

Floor poured.  Moving to the outside.  05 MAY 2017

023

Aierial view. All of the concrete poured.  05 MAY 2017

024

Aerial view.  05 MAY 2017

025

Finishing the concrete.  05 MAY 2017

026

Finishing the concrete.  05 MAY 2017

027

Traditional mark showing the year the concrete was poured.  05 MAY 2017

028

Looking good.  05 MAY 2017

029

Craig Pater and son backfilling foundation trench.  06 MAY 2017

030

Alpine Stringham backfilling foundation trench.  06 MAY 2017

031

Three “Old Star Geezers”, Bruce Grim, Rodger Fry and Patrick Wiggins at work.  06 MAY 2017

032

Luke Moses backfilling foundation trench.  06 MAY 2017

033

Bruch Grim, Enid Norton, Luke Moses & Jim Keane excavating backfill dirt.  06 MAY 2017

034

Patrick Wiggins moving a load of dirt.  Rodger Fry photo.  06 MAY 2017

035

Enid Norton.  Rodger Fry photo.  06 MAY 2017

036

Mike Clements and Jim Keane.  Rodger Fry photo.  06 MAY 2017

037

Foundation trench filled in.  06 MAY 2017

038

Luke Moses.  Rodger Fry photo.   06 MAY 2017

039

Craig Pater and son removing viewing pad forms.  Rodger Fry photo.  06 MAY 2017

040

06 MAY 2017

041

Luke Moses & Mike Clements adding fill to Grade slope around viewing pad.  06 MAY 2017

042

06 MAY 2017

043

06 MAY 2017

044

Rodger Fry photo.  06 MAY 2017

045

06 MAY 2017

045

06 MAY 2017

047

Today's SLAS work crew:  Mike Clements, Alpine Stringham, Jim Keane, Craig Pater and son, Patrick Wiggins, Rodger Fry and Enid Norton.  Luke Moses photo.  06 MAY 2017

048

06 MAY 2017