Images from SLAS Member
Erik Hansen (click on images for enlarged view)
Up
001
April 2000
Erik standing by Pier for Losmandy G11, foundation nicely cured.
002
May 2000
Framing about 3/4's done
003
May 2000
Framing almost done, same day as pic 2, looking off Erik's patio.
004
End of May 2000
Framing completed, inside is 9'x11'
005
May 2000
Erik standing at the doorway
006
Beginning June 2000
Plywood around walls, waiting for the steel channel to be galvanized.
007
14 June 2000
Trusses next to the rails with the 4 inch casters, each with 700 lb capacity.
008
18 June 2000
View of the rail system, casters ride in 3 inch u-channel galvanized so it won't look wounded in a couple years.
009
18 June 2000
Roof trusses placed on 4x6 beams.
010
19 June 2000, Fathers Day
Roof with plywood sheeting. Over telescope house.
011
19 June 2000
Roof rolled-off, moved very easily. Hope it rolls as well with 400 more pounds on it!
012
06 July 2000
Roof with shingles (steel with lifetime warranty) siding and trim, ready to be painted.
013
06 July 2000
Observatory painted with roof on. 014
06 July 2000
Roof rolled off, still does roll quite easily. 015
12 July 2000
My telescope has a home, Jaegers' 6 inch f/5 mounted on a G-11 German Equatorial by Losmandy.
016
12 July 2000
The turnbuckles that keep roof from blowing off, I installed one on each corner.
017
August 2005
Clubs H-Alpha DayStar Filter and Telescope
018
August 2005
Landscaping
019
August 2005
Landscaping
Up
|